Construction waste crusher

SBM mining machine said that in order to fundamentally solve the problem of dumping construction waste, the development of landfill for construction waste is imminent. Construction waste can be used as secondary resources, recycling it can greatly expand the access to mineral resources. In this city, an average of more than 100 truckloads of construction waste are dumped every day. For example, a car can only cost 10 tons. The daily construction waste can reach over 1,000 tons. Why construction rubbish indiscriminate repeated repeated ban more than ban? Urban management department said an objective reason can not be avoided is: the city does not have a dedicated processing field to focus on the consumption of these building rubble stone crusher is necessary for infrastructure construction, construction waste crusher why the construction rubbish chaos buried repeatedly According to the person in charge of the sanitation department, at present, the treatment methods of construction waste are mainly simple landfills, and the city has no special construction waste disposal sites, which is the main reason leading to the construction garbage siege. Urban Administration said Monday, November 13, 2017 A large amount of construction waste can only be dumped in the outskirts of the city for a long time. However, some drivers are sometimes directly free to drop on either side of the road in order to reduce transportation costs or increase their throughput. Caused a bad influence, but also added a lot of problems to the environmental protection department. Recently, SBM's construction waste crushing plant was launched in the environmental protection project, opening up the city's road to recycling and construction of construction waste. The equipment can crush the material in the field without having to remove the material from the site and then crushing, and can move with the advancement of the raw material mining face, thus greatly reducing the material transportation cost. After crushing the production of recycled aggregate used directly attached.

评论

此博客中的热门博文

Artificial aggregate production process and advantages and disadvantages

Raymond Mill grinding system new advantages

New sand maker consolidates infrastructure construction