How to improve the efficiency of construction waste crusher and obtain large production capacity

High-capacity, high-efficiency equipment is pursued by every user, but in addition to the equipment itself, the operations in production are also closely related to its efficiency. Taking the construction waste crusher as an example, the following several production suggestions can improve the efficiency to a certain extent and obtain large production capacity. 1, adjust the size of the closed side discharge outlet to change the output The output of a construction waste crusher can be achieved by adjusting the size of the closed side discharge port. When the size of the closed side discharge port is larger, the higher the production capacity of the construction waste crusher, the worse the quality of the finished product; conversely, the smaller the size of the closed side discharge port, the smaller the output, and the better the quality of the finished product, so the manufacturer can Adjust your own actual needs. 2, belt conveyor even feeding When entering the material, it is required that the belt conveyor evenly input the materials. The materials must meet the requirements for the crushing materials of the construction waste crusher. Too little or too much material will affect the production efficiency of the equipment. In addition, the operator needs to pay close attention to the discharge of the construction waste crusher, control the speed of the belt conveyor, and ensure normal feeding and discharging. 3, full feed When installing the feeding device, pay attention to the speed and the corresponding drop relationship when the ore enters the crusher. In general, because of the constant conveyor speed, only the height of the ore drop height can be selected. While being full of ore, it is necessary to pay attention to the time when feeds are not available, and to control the height of the heap in the feeding device. 4, reduce the mineral powder into the cylinder liner and extend the life of the seal ring Every time the liner is replaced, it is necessary to check whether the dynamic cone dust seal is intact. Under normal circumstances, when the wear gap between the dustproof seal ring and the sliding ring is greater than 1.5mm, the dustproof sealing ring should be replaced to prevent the mineral powder from entering the cylinder liner and causing damage to the spindle and other components. 5, lube oil temperature must maintain equilibrium Because the lubrication and heat dissipation of the main lubrication parts of the construction waste crusher, such as the main shaft, eccentric sleeve, eccentric shaft, frame bearing, and spindle adjustment piston, sliding bearing surface, gear rotation, etc., are mainly dependent on the lubrication system, the selection of an appropriate cooling device is very important. important. 6. Pay attention to the bolting of the dust-proof sealing slip ring In the case where the material accumulated on the cross beam is not cleaned in time, the bolts of the fixed slip ring follow the movement of the movable cone and the accumulated material to cause relative movement, resulting in wear of the bolt tail. If there is a problem with the fixing of the slip ring, a serious technical inspection must be carried out to avoid the adverse consequences of slip ring slip.

评论

此博客中的热门博文

Artificial aggregate production process and advantages and disadvantages

Raymond Mill grinding system new advantages

New sand maker consolidates infrastructure construction