How to properly handle the construction waste disposal equipment?

How to properly handle construction waste crusher equipment is a skill that skilled workers must master. First of all, it is necessary to meet the requirements that all inspections should be carried out before the construction waste treatment equipment is started up, and the following requirements can be met before the construction waste treatment equipment can be started. (1) Whether the bolts in all places are firmly tightened. (2) Each lubrication and cooling system should comply with the design requirements and relevant documents, each pipeline valve should be flexible and reliable, no leakage phenomenon, the oil level of each lubrication station reaches the specified elevation, if the winter, the lubricant should be heated To 20 ~ 25 °C, check the oil, gas, water flow and pressure; (3) The safety contact signals and safety protection devices in various places should be flexible and reliable, normal interlocking, and correct meter display; (4) Check whether the auxiliary equipment is installed and whether it can operate normally, and ensure that the materials are unblocked after the start of the mill; (5) Clean up the site and eliminate obstructions that affect the operation of construction waste treatment equipment. Do not stand on both sides of the construction waste disposal equipment. (6) Check whether the slow-drive clutch is flexible and reliable. When not in use, it should be in the disengaged position and be reliably fixed; (7) The rotation direction of the motor must meet the requirements of the drawing (should be checked by rotation of the motor). In addition, when the construction waste treatment equipment is first started, it must use the following method: (1) Slowly rotate the construction waste treatment equipment by 1-2 revolutions with a slow drive to check the conditions of each department. (2) Motor idle (without construction waste disposal equipment and air clutch), continuous operation for 4 hours. (3) Drive the construction waste treatment equipment to run continuously for 24 hours (without steel balls and materials).

评论

此博客中的热门博文

Artificial aggregate production process and advantages and disadvantages

Raymond Mill grinding system new advantages

New sand maker consolidates infrastructure construction