History of Gold Ore crusher Production Process

Modern crushing machinery is in the steam engine and motor and other power machinery after the gradual improvement and promotion have been created after. In 1856, the United States developed a crusher crushing machine with continuous crushing action in 1878, and its production efficiency was higher than that of the crusher Intermittent crushing action of gold ore crusher production process; in 1895, the United States William invented lower energy consumption impact crusher. A Brief Introduction to the Structure of Crushed Crushed Gold Ore crusher Production Process The machine mainly by the rack, moving jaw, eccentric shaft, jaw plate, brackets and other components. The motor moves the eccentric shaft through the V-belt, allowing the movable jaw to move in accordance with the adjusted track, thereby breaking the material in the crusher cavity. The frame is made of steel plate welded structure, and the front wall of the frame is fitted with a fixed jaw plate with fastening bolts. A side panel is provided on the inner side wall of the rack around the gold ore crusher to protect the inner wall of the rack. The movable jaw is a molded steel piece with a movable jaw plate on its front and its upper part is suspended from the frame by the eccentric shaft and the roller bearing. The lower part is supported on the bracket and rolling in the brackets. There are flywheels and sheaves. The other end of the bracket is supported on the adjustment beam and in its rolling contact. In addition to supporting the action of the elbow in the outer jaw, in the external can not be crusher foreign body, into the crushing chamber, the machine load in the case of sudden increase from the insurance role, that is, their rapid fracture, so as to protect other parts from damage. Adjust the crossbar and the rack side wall wall welded steel connection, when the discharge port is small, first relax the rod spring and tighten the screw, and then use the wrench to rotate the set screw, is the starting screw up the gasket, The newly added gasket, until the required discharge port size, first return the stop screw, so that the gasket by the moving jaw parts weight, tighten the tightening screw and tighten the fixed. The last appropriate tightening the rod spring, and vice versa from small to large (out of the gasket)

评论

此博客中的热门博文

Artificial aggregate production process and advantages and disadvantages

Raymond Mill grinding system new advantages

New sand maker consolidates infrastructure construction